11-10-22: Temporary wall panels are removed between the existing facility and the expansion
11-14-22: A dust curtain temporarily remains between the current plant and expansion
11-14-22: Bathroom tiling has been installed in the new restroom
11-14-22: Electrical connections are complete
11-14-22: An asphalt driveway is added to connect the east and west dock areas
11-14-22: Asphalt leveling
11-10-22: Temporary wall panels are removed between the existing facility and the expansion
11-14-22: A dust curtain temporarily remains between the current plant and expansion
11-14-22: Bathroom tiling has been installed in the new restroom
11-14-22: Electrical connections are complete
11-14-22: An asphalt driveway is added to connect the east and west dock areas
11-14-22: Asphalt leveling